Build garden wall, repointing, roof check
- Brickwork
- Norwich
- Posted 17th Apr 2025
Build a 2m long wall on an existing tiled concrete base between tow existing brick walls to make a contained flower bed. Smarten up about 4m of pointing at the base of the house to a level of around 3 courses of bricks. Check out a leaking roof on an 3m by 3m outbuilding and provide quote for undertaking its repair.