Several small jobs which need doing


  • Plumbing
  • Rushden
  • Posted 8th Oct 2017

Note: These jobs can only be done next Saturday 14th October.

Job 1. Main stopcock stuck, can not turn water off.

Job2. Ball cock in downstairs toilet not opening fully. Cistern takes a long time to fill.

Job 3. Ball cock in water tank stuck open.
Positive Review for Chris Build on 14th Oct 2017
Chris turned up slightly early and was very polite. He got on with the jobs required and left everything clean & tidy. Chris identified another job that will need doing in the future but did not pressure me into getting it done. In fact he told me that it was easy for me to do myself. I will use again.